NZ BRICK SUPPLIER – AUBRICKS – TECHNICAL DETAILS

NZ Bricks Supplier Aubricks Technical info 01 CONCRETE SLAB & FOUNDATION opt 1
CONCRETE SLAB & FOUNDATION opt 1

Weepholes every third perpend Damp Proof Course DPC
Recommend mortared slope with 2 coats Flintkote
D10 bars at 600 crs max. ht. 500mm D12 over 600 high
25mm min. To Paved Ground. 150mm min. To Upaved Ground
100mm min. To Paved Ground. 150mm min. To Unpaved Ground.

 

NZ Bricks Supplier Aubricks Technical info 01 CONCRETE SLAB & FOUNDATION opt 2
CONCRETE SLAB & FOUNDATION opt 2

Weepholes every third perpend Damp Proof Course DPC
Recommend mortared slope with 2 coats Flintkote
D10 bars at 600 crsmax. ht. 500mm D12 over 600 high
4 – D12 Horizontal with R6 @ 600 crs

 

NZ Bricks Supplier Aubricks Technical info 02 BRICK VENEER TYPICAL WALL SECTION
BRICK VENEER TYPICAL WALL SECTION

5 screw fixed ties per sq.m 600mm horizontally, 400mm vertically, or alternatives First brick tie within 400mm of the foundation
Hot-dipped galv. brick ties screw-fixed, select lenth for cavity width and brick size.

 

NZ Bricks Supplier Aubricks Technical info 03 FLAT SOFFIT DETAIL
FLAT SOFFIT DETAIL

Fibre cement sheet of H3 plywood soffit closure

 

NZ Bricks Supplier Aubricks Technical info 04 BRICK VENEER FLOOR REBATE DETAIL
BRICK VENEER FLOOR REBATE DETAIL

70mm AuBricks Brick Veneer
25mm to paved ground, 100mm to unpaved ground
100mm to paved ground, 150mm to unpaved ground

 

NZ Bricks Supplier Aubricks Technical info 05 flr rebate detail - below grd
REBATE DETAIL – BELOW GRD

70mm AuBricks Brick Veneer
DPC laid in middle of mortar course
2 Coats Flintkote on brick face below ground or polythene DPC

 

NZ Bricks Supplier Aubricks Technical info 06 CANTILEVER UPPER FLOOR

CANTILEVER UPPER FLOOR

Cladding Over Wall Underlay
Fibre cement sheet of H3 plywood soffit closure
Nogging for Soffit Installation

 

NZ Bricks Supplier Aubricks Technical info 07 DECK CONNECTION
DECK CONNECTION

70mm AuBricks Brick Veneer
Membrane Flashing on Angle 150mm Up Wall Cavity
Wall plated bolted to framing through 20mm timber packers

 

NZ Bricks Supplier Aubricks Technical info 08 WINDOW HEAD - ALUMINIUM
WINDOW HEAD – ALUMINIUM

Polythene flashing extended 150mm each side of opening (optional)
Weepholes at 800mm crs (optional)

 

NZ Bricks Supplier Aubricks Technical info 09 WINDOW SILL - ALUMINIUM
WINDOW SILL – ALUMINIUM

Flashing tape along entire sill, 100mm up jambs, and 50mm onto building wrap
Galv. metal or 200mm Supercourse 500 polythene flashing taken 200mm past opening

 

NZ Bricks Supplier Aubricks Technical info 10 WINDOW JAMB - ALUMINIUM
WINDOW JAMB – ALUMINIUM

Fix at this point leave flashing hanging in brick cavity
Water risistant Air Seal to perimeter of trim cavity
200mm Supercourse 500 polythene flashing, clout fixed over building paper

 

NZ Bricks Supplier Aubricks Technical info TOP OF ROOF SLOPE OPTION - TIMBER SUPPORT
TOP OF ROOF SLOPE OPTION – TIMBER SUPPORT

First ties in bottom mortar courses at 400crs. Next row within 315mm
Vent every third perpend Top edge of roofing material must be below mortar bed, to avoid debris blocking weepholes

LOADING